The Navhind Times
Tuesday, 23 Jun 2026
Subscribe
  • Home
  • Goa News
  • National News
  • World News
  • Business
  • Sports
  • Opinion
    • Editorial
    • Letters to Editor
    • Commentary
  • Magazines
    • B & C
    • Buzz
    • Zest
    • Panorama
    • Kuriocity
  • Kuriocity
  • GoGoaNow
  • Contact us
  • 🔥
  • Top
  • Goa News
  • Featured
  • National News
  • Sports
  • World News
  • Buzz
  • Editorial
  • Letters to Editor
  • Commentary
Font ResizerAa
The Navhind TimesThe Navhind Times
  • Home
  • Goa News
  • National News
  • World News
  • Business
  • Sports
  • Opinion
  • Magazines
  • Kuriocity
  • GoGoaNow
  • Contact us
Search
  • Home
  • Goa News
  • National News
  • World News
  • Business
  • Sports
  • Opinion
    • Editorial
    • Letters to Editor
    • Commentary
  • Magazines
    • B & C
    • Buzz
    • Zest
    • Panorama
    • Kuriocity
  • Kuriocity
  • GoGoaNow
  • Contact us
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
FeaturedGoa News

State to strive for 1,550 MW green energy in five years

nt
Last updated: January 11, 2025 1:34 am
nt
Share
SHARE

Panaji : Pushing towards its ambition of 100% green energy usage by 2050, the state government is planning for a whopping 1,550 MW of renewable energy in the next five years, according to the state government’s submission to the 16th Finance Commission.

To achieve the green energy capacity, Rs 7,350 crore has been sought from the Finance Commission.

Of the envisaged future capacity, 1,400 MW will be from solar power generation, while 150 MW will be from wind and other renewable energy sources such as biogas, small hydro and waste-to-energy projects, the outlined plans indicated.

In addition, another 1,000 MW per hour of renewable energy is proposed through the installation of energy storage capacity.

The state’s solar power generation capacity presently is in the range of 65 MW. The government aims to increase the solar energy capacity considerably through rooftop installations on government buildings, floating projects on waterbodies, canal solar projects, and ground-mounted solar parks under the central Kusum scheme.

Of the fund requirement, Rs 400 crore will be needed for solar rooftop installations, while the bulk of funding Rs 5,200 crore is envisaged for large solar projects.

The setting up of the energy storage capacity will cost Rs 1,500 crore, disclosed the government.

“Though there are other modes that can be explored such as Renewable Energy Service Company (RESCO), a funding mode where a third-party company (the RESCO), installs, operates and maintains a solar energy system on a client’s property, the government has said that it will need funds to finance the capital expenditure of the targeted capacity addition.

Overall the entire power sector will require a total financial assistance of Rs 11,510 crore, as Rs 4,160 crore will go towards strengthening the electricity transmission and distribution system, improving the billing and collection efficiency, and complete ongoing work on the underground cabling network, the government said.

The electricity department so far has completed only 30 per cent of the underground cabling works, with 3,731.6 Ckms underground network achieved out of 11,910.9 Ckms overhead network, it said.

Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print
Previous Article Goa gets Centre’s Rs 667.91 cr for tax devolution
Next Article Goa plans to set up water metro, ropeway, oceanarium by 2030

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
XFollow
InstagramFollow
YoutubeSubscribe
- Advertisement -

You Might Also Like

Goa News

Traffic cops seize 21 motorbikes fitted with modified silencers

By nt
Goa NewsFeatured

Pensioners beware of new digital life certificate scam in circulation

By nt
Goa News

70 km underground cabling completed in Sattari, balance before monsoon

By nt
FeaturedGoa News

Rs 50 lakh annual food bill for Bondla Zoo

By nt
The Navhind Times
Facebook Twitter Youtube Rss Medium

About US

The Navhind Times – Goa News

The Navhind Times, the first and largest circulated English Daily from Goa, has earned the trust, respect and loyalty of the Goans by virtue of its objective reporting, commentaries, features and breaking goa news. It was launched by the House of Dempos, a pioneer in the industrial development of Goa, on February 18, 1963 soon after Goa was liberated from the Portuguese rule.

Top Categories
Usefull Links
  • Android App Privacy Policy
  • Contact us

© The Navhind Times. All Rights Reserved.

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?